Dec’03 to 2007 as Group Vice President with EPC Emirates, Dubai Key Deliverables: Dealing with EPC projects and heavy fabrication in oil / gas and industrial sectors for the following projects. Petroleum Handling Depot, Fujirah on turnkey basis, Client: Mott Macdonald / GPS. Kawather Gas Plant, Client: Petrofac / PDO Shell Oman. FPSO systems for Dubai dry docks, Client: Saipem.
Apr’02 to Dec’03 with Limmak-Punj Lloyd JV, Turkey as Project In-charge, Ankara / Adana Key Deliverables: Performing the tasks related to construction based works and remaining as the in charge of the Turkish portion of B.T.C Pipeline, 42/36 X 302 km. Client: British Petroleum / Bohtas. Managing an international work force of 400 employees in Turkey. Maintaining the contract value worth $120 million.
Nov’97 to Mar’02 with Dodsal Ltd., Mumbai as Vice President / Chief Operating Officer Key Deliverables: Laying of cross country pipe lines including cased crossing, river crossings, water bodies, terminal works, Cathodic protection system, hot tapping, caliper survey, hydro testing, etc. in hard rocky areas like densely populated, rocky & water locked areas. Executing projects worth Rs. 550 crores over a period of five years in the oil & gas sector in India. Handling clients like GSPC / IOC / PETRONET / IPCL. Executing major tasks like pipelines / vessels / rotating & static equipments / heavy lifts, etc.
Dec’91 to Oct’97 with Al-Jalhami Contracting Co. Multi Divisional, Saudi Arabia as Project Manager A multi-discipline contracting company in Pipelines, Electro-mechanical, Process control, Instrumental, Civil Structural Maintenance in Oil & Gas Industry. Client: ARAMCO ( Saudi Arabian Oil Company). Key Deliverables: Executed turnkey projects with total value worth US $ 55 million involving 2,150,000 man hours with the following activities. Flow Metering System including pipelines for Super Light Arab Crude, Diesel Oil, Premium Gasoline, Jet Fuel (JP4 & JP8) using accuload / Smith Systems. Conducing the metering of hot asphalt & VAC bottom using Brooks System. Handling with mainline pumps, booster pumps, meters, provers, oily water separators and pig launchers. Maintaining the trunk and feeder lines up to 26” O with hot taps & tie in activities. Monitoring the Pipe line coating, cathode protection, fire protection & safety facilities.
Client: A.O.C. (Arabian Oil Company) Al Khafji Joint Operations [Saudi Aramco] Designation : Project Manager Ratawi Onshore Oil Production Facilities (Contract No. GT 332 FM 92) Key Deliverables: Performed installation & commissioning of H.S. / L.S. separators, gas scrubbers, flare knock out drum, flare stack, desulfurizer column, fuel gas scrubber, hout desalter vessel, heat exchangers, convection heater & wash water tank.
20th overhaul & shutdown of Refinery Plant (Contract No. GT 576 FM 95) Key Deliverables: Maintained and executed complete overhauling, chemical cleaning, high pressure water jetting of heat exchangers (30 Nos), columns, condenser, overhauling of cooling tower, steam generator and hot insulation.
Client: Shell, Additive Blending Facility, JOSLOC Designation : Project Manager Key Deliverables: Designed, procured and established 3 nos. storage tanks, mass flow metering system, pumping, piping network & associated electrical, instrument and civil & structural works.
Client: TEXACO (Getty Oil Company) Designation : Project Manager Key Deliverables: Handled all assigned tasks related to re-routing of 8” & 10” gas and crude pipelines at Wafra, Kuwait. Maintained fresh water pipeline system, modified tank 314 & relocated 3 tanks at Mina Saud, Kuwait.
Sept’90 to Dec’91 with Punj Lloyd Co. Ltd., New Delhi as Engineer A leading company in executing multiple projects in cross country pipelines, turnkey & general construction projects. Key Deliverables: Dec’ 88 to Sept’90 with Jaykay Synthetics Ltd., New Delhi/ Dadri as Deputy Engineer of the project Department. A flagship of Jaykay Group. Key Deliverables: Dealing with EPC projects and heavy fabrication in oil / gas and industrial sectors for the following projects. Installing & commissioning complete utilities & process area of 15,000 TPA DCL Polyester Plant at Nagpur Performing the installation and commissioning of piping systems for utilities & process areas. Preparing equipments, piping layouts, key plans, G. A’s isometrics. Selecting material and equipments of various in- house projects.
| |